NEOM Spine, Saudi Arabia
Engineering Director for the design of the Spine Infrastructure of the new 160km long ultra-modern, highly sustainable, city development for 9 million people. The infrastructure incorporates high speed rail, freight, intercity rail and utilities transmission throughout the length (with possible provision for Hyperloop), all buried in bored and cut-and-cover tunnels. Developed precast concrete arch solution which saved ~£800m.
HS2, UK
AECOM Programme Director for HS2 (2015-2020) – with up to 15 contracts running concurrently including:
Taiwan High Speed Rail Link – Contract C250
Benaim director for the design of a section of the viaducts for the Taiwan High Speed Railway, for trains travelling up to 350km/h. The precast concrete beam viaduct is 3.5km long with an area of 50,000m2. It interfaces with a station and includes connecting links to the maintenance depot. Design further complicated by the need to accommodate high earthquake forces, and construction in a built-up area.
HS2, UK
Copyright © 2024 Mark Raiss Consulting - All Rights Reserved.